Human Error, Speeding Behind Abuja-Kaduna Train Derailment – NRC

1 month ago 11

Following interior investigations, the Nigerian Railway Corporation has attributed the caller Abuja–Kaduna bid derailment, which near 20 passengers with assorted degrees of injuries, to quality error, excessive speeding and the misapplication of the exigency braking strategy arsenic superior causes.

On Monday, the Corporation’s Managing Director, Dr Kayode Opeifa, signed a connection confirming the palmy completion of betterment and repair efforts pursuing the August 26 derailment incidental astatine Asham.

PUNCH Online reports however a rider bid travelling from Abuja to Kaduna derailed connected August 26, a Tuesday morning, leaving respective carriages overturned and triggering panic among those connected board.

It was gathered that the incidental occurred on the fashionable corridor soon aft the bid departed Abuja astir 11 a.m., en way to Kaduna.

The incidental caused passengers to fly for safety. While galore described the country arsenic chaotic and frightening, immoderate others initially thought it was a violent attack.

The NRC revealed that it has completed an interior probe into the derailment, and absorption has accepted each recommendations from the in-house team.

“While awaiting findings from the committee acceptable up by the Honourable Minister of Transportation, Senator Said Alkali, and the Nigerian Safety Investigation Bureau, the Corporation reiterated its ain findings, attributing the incidental to relation mistake and excessive speed”, the connection partially read.

Opeifa further stated that each affected coaches and locomotives person been re-railed and moved to designated workshops for broad valuation and further method work.

He said, “Our squad of engineers has successfully repaired the main enactment to a level that allows america to resume operations safely. While bid services volition recommence, enactment connected the secondary way volition proceed simultaneously. During this period, the 2nd enactment volition stay retired of usage until each indispensable repairs are completed.

He besides said that an authoritative announcement regarding the resumption of bid services connected the Abuja-Kaduna corridor would beryllium made soon.

While revealing the in-house findings, Opeifa said, “We person besides completed an in-house probe into the incident, with absorption accepting each recommendations of the interior probe team.

“While awaiting the result of the committee acceptable up by the Honourable Minister of Transportation, Senator Sa’idu Alkali, arsenic good arsenic the findings of the Nigerian Safety Investigation Bureau, we privation to authorities intelligibly that our probe points to quality error, excessive speeding, and misapplication of the exigency braking system.”

However, the NRC brag clarified that portion bid services would soon recommence, repairs connected the secondary way volition proceed until afloat completed.

He further disclosed that a broad information and infrastructure appraisal was underway earlier the due resumption of work successful the corridor.

Read Entire Article